Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Waterproofing

عزل مائي

Layers preventing water ingress into structural elements or spaces, such as bituminous membranes and cementitious coatings.

Category: Structure & materials

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Waterproofing is a layer that keeps water and damp out of concrete, steel and rooms, in foundations, bathrooms, kitchens, roofs and tanks.

Why it matters on a project

It costs little compared with fixing a leak after finishing, so it is flood-tested before being covered.

Measurement and pricing

Measured in square metres including upturns on walls and overlaps between rolls.

Worked example

A 2.0 × 2.5 m bathroom floor = 5.0 m², plus a 30 cm upturn on a 9 m perimeter = 2.7 m², total 7.7 m² before overlaps.

Common mistake

Tiling straight over it without a 48-hour flood test, or skipping collars around drains and pipes.

Frequently asked questions

How long is a flood test?

Usually 24 to 48 hours per the specification, while watching the ceiling below.

What is the best roof waterproofing?

It depends on the roof and its use; bitumen membranes and liquid systems such as polyurea are common, with protection on top.

Related terms

Does your project need structural design and reinforcement drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote