Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Putty (skim coat)

معجون

A thin smooth layer over plaster preparing the surface for paint.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Putty (filler) is a fine material applied over plaster or gypsum in thin coats and sanded, to fill pores and small defects and give a smooth surface before painting.

Why it matters on a project

The number of putty coats and the quality of sanding make the difference between ordinary and premium paintwork, more than the paint brand itself.

Measurement and pricing

Usually included in the painting item per square metre, with the number of coats stated in the specification.

Common mistake

Applying one thick coat instead of thin ones, so it cracks or peels later.

Frequently asked questions

How many putty coats for good paintwork?

Two to three thin coats with sanding between, depending on the surface and finish level.

Is ready-mixed putty better than site-mixed?

Ready-mixed is more consistent and easier to apply, provided it suits the paint system.

Related terms

  • Plaster (render)A cement or gypsum layer applied to walls to level them before paint or cladding.
  • Emulsion paintWater-based paint for internal walls and ceilings, in various sheen levels.
  • Surface preparationCleaning a steel surface to a specified grade (e.g. SSPC-SP 10) before coating to ensure adhesion.
  • Gypsum board (drywall)Gypsum panels on metal framing for dry walls and ceilings.

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote