Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Scaffolding

السقالات

Temporary working platforms for access at height.

Category: Safety & quality

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Scaffolding is a temporary structure of tubes, fittings and boards forming safe working platforms at height, for construction, external finishing and maintenance.

Why it matters on a project

Most serious site injuries are falls from height, and uninspected or incomplete scaffolds are a leading cause.

Measurement and pricing

Usually priced per square metre of facade for a set period, or as monthly hire.

Worked example

A facade 20 m long and 9 m high: scaffolding = 20 × 9 = 180 m² for the agreed period.

Common mistake

Using a scaffold without a valid inspection tag or without guardrails and toe boards.

Frequently asked questions

Who inspects the scaffold?

A competent person before first use, periodically, and after any alteration or high wind, with a tag fixed to it.

When is rope access an alternative?

On tall facades and short or scattered jobs, where scaffolding would be costly or slow to erect.

Related terms

  • Permit to workWritten authorisation for hazardous work (hot work, work at height, confined spaces) under set conditions.
  • PPEHelmet, high-visibility vest, safety boots, glasses, gloves and harness as the activity requires.
  • Risk assessmentIdentifying hazards in each activity, estimating likelihood and severity and setting controls before work starts.
  • Work at heightAny work where a person could fall from one level to a lower one.

Read next

Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote