Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Work at height

العمل على ارتفاع

Any work where a person could fall from one level to a lower one.

Category: Safety & quality

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Work at height is any work where a person could fall a distance liable to cause injury, on scaffolds, roofs, ladders or ropes, and it needs planning, a permit and fall protection.

Why it matters on a project

The order of control is clear: avoid work at height where possible, then prevent falls with barriers, then reduce the consequences with harnesses and nets.

Common mistake

Clipping a harness to an anchor point not designed to take a fall load.

Frequently asked questions

What height counts as work at height?

Any height from which a fall could cause injury; regulations and site rules set the detailed requirements.

Is a harness enough on its own?

No. It needs a suitable anchor, a suitable lanyard, a rescue plan and training.

Related terms

  • ScaffoldingTemporary working platforms for access at height.
  • Permit to workWritten authorisation for hazardous work (hot work, work at height, confined spaces) under set conditions.
  • PPEHelmet, high-visibility vest, safety boots, glasses, gloves and harness as the activity requires.
  • Risk assessmentIdentifying hazards in each activity, estimating likelihood and severity and setting controls before work starts.

Read next

Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote