Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Tile grout

الترويب

The material that fills the joints between tiles.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Grouting fills the joints between tiles with a cementitious or epoxy material. It seals the joint against water and dirt and completes the finished look. A 2 to 3 mm joint is common for rectified porcelain, wider for non-rectified tiles.

Why it matters on a project

Grout colour and type change the look of the whole floor, and cement grout in bathrooms and kitchens stains and cracks over time.

Measurement and pricing

Usually included in the tiling rate per square metre, with epoxy listed separately because it costs much more.

Common mistake

Grouting before the adhesive has set, or letting epoxy residue cure on the tile surface where it is hard to remove.

Frequently asked questions

When should I use epoxy grout?

In bathrooms, kitchens, pools and areas that need stain and chemical resistance.

How long before grouting?

Usually 24 hours after laying, or per the adhesive data sheet.

Related terms

  • Porcelain tilesHigh-density, low-absorption ceramic tiles suited to heavy-use floors.
  • Tile adhesiveA modified cementitious mortar that fixes tiles instead of traditional mortar.
  • MarbleA natural stone used for floors, walls and stairs, requiring periodic surface protection.
  • Floor screedA thin mortar or concrete layer that levels the floor before tiles or parquet.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote