Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A mock-up is a full-size piece of the work, such as a facade bay, a typical room or a complete bathroom, built for the owner and consultant to approve before full production.
Why it matters on a project
It reveals colour, detail and material coordination problems on a small area instead of after the whole building is done.
Measurement and pricing
Usually priced as a separate BOQ item.
Common mistake
Building the mock-up with a different team or materials from those that will do the project.
Frequently asked questions
Is a mock-up demolished after approval?
It depends on the agreement; it can stay as part of the building if built in its final position.
How is a mock-up different from a material sample?
A sample is a small piece of the product; a mock-up combines materials, details and installation at full size.
Related terms
- Material submittalA request to approve a material or product with manufacturer data and samples before supply.
- 3D visualisation (rendering)Realistic images of the design produced from a 3D model for presentation and approval.
- Quality control planThe list of inspections, tests and hold points for each activity and who approves them.
- GRC (glass-fibre reinforced concrete)A cement mix reinforced with alkali-resistant glass fibres, lightweight, used for facades and ornament.
Read next
Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote