Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Skirting

الوزرة

A strip at the base of the wall that protects the wall-floor junction.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Skirting is a strip about 7 to 12 cm high fixed at the base of the wall, in the floor material, timber or metal, to cover the floor joint and protect paint from cleaning and knocks.

Why it matters on a project

A small detail that shows in every room; if it is crooked or its joints are visible, the whole finish looks poorer.

Measurement and pricing

Measured in linear metres with door openings deducted.

Worked example

A 4 × 5 m room has an 18 m perimeter less a 0.9 m door: 17.1 linear metres of skirting.

Common mistake

Fixing it before the plaster at the wall base is straight, leaving gaps behind it.

Frequently asked questions

What height should skirting be?

Usually 7 to 12 cm, chosen by ceiling height and design style.

Is skirting fixed before or after painting?

Usually before the final coat of paint, with its edge masked while painting.

Related terms

  • Porcelain tilesHigh-density, low-absorption ceramic tiles suited to heavy-use floors.
  • Parquet (wood flooring)Natural or engineered wood flooring laid over an underlay.
  • MarbleA natural stone used for floors, walls and stairs, requiring periodic surface protection.
  • Plaster (render)A cement or gypsum layer applied to walls to level them before paint or cladding.

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote