Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Parquet (wood flooring)

باركيه

Natural or engineered wood flooring laid over an underlay.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Parquet is flooring of solid wood, engineered wood or laminate boards, glued down or floated over an underlay.

Why it matters on a project

Wood reacts to moisture and heat, so slab moisture is measured before laying and an expansion gap is left at the walls.

Measurement and pricing

Measured in square metres plus cutting waste; skirting in linear metres.

Worked example

A 20 m² room with 7% waste = about 21.4 m² of parquet to order.

Common mistake

Laying it on a newly poured slab that has not dried, so the boards swell and gaps open.

Frequently asked questions

What is the difference between solid and engineered parquet?

Solid is wood throughout; engineered has a real wood top layer on a multi-ply base that is more stable with moisture.

Can parquet go in bathrooms and kitchens?

Not recommended in bathrooms; kitchens need a water-resistant type and extra care.

Related terms

  • Porcelain tilesHigh-density, low-absorption ceramic tiles suited to heavy-use floors.
  • LevelThe vertical height of a point relative to a datum (zero level).
  • Waste allowanceA percentage added to material quantities to cover cutting, damage and site loss.
  • Expansion jointA joint allowing the building to expand and contract thermally without cracking.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote