Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
HPL cladding is panels of paper layers pressed with resin under high heat and pressure. They resist scratches and moisture and are used for interior and exterior wall cladding and toilet cubicles.
Why it matters on a project
They give a wood or stone look with little maintenance, but exterior panels must be UV-rated and fixed on a ventilated frame.
Measurement and pricing
Measured in square metres including frame and fixings.
Common mistake
Using interior-grade panels on facades, so the colour fades in the sun within a short time.
Frequently asked questions
Are HPL panels fire-rated?
Fire-rated grades exist with a stated classification; check the certificate against the building use.
How thick are HPL facade panels?
Usually 6 to 10 mm for exterior facades, thinner for interior cladding.
Related terms
- Aluminium composite cladding (ACP)Aluminium composite panels for facade cladding; a fire-rated core must be selected per the fire code.
- Elevation (facade)A drawing of the building’s external face showing openings, materials and heights.
- Material submittalA request to approve a material or product with manufacturer data and samples before supply.
- Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.
Read next
Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote