Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Material submittal

اعتماد مواد

A request to approve a material or product with manufacturer data and samples before supply.

Category: Safety & quality

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A material submittal is the contractor sending data and samples of a proposed material to the consultant before purchase, to show it meets the specification.

Why it matters on a project

Supplying unapproved material can end in rejection and removal. Early approval protects the programme from supply waits.

Measurement and pricing

Usually includes the manufacturer's catalogue, test certificates, a sample and a compliance statement against the specification.

Common mistake

Submitting a general catalogue without stating the exact model, colour and thickness proposed.

Frequently asked questions

How is a material submittal different from a shop drawing?

The submittal is about the product itself; the shop drawing is about how it is fabricated and installed.

What does code B, approved as noted, mean?

Work may proceed following the comments, and a resubmission may be required for the record.

Related terms

  • Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.
  • Quality control planThe list of inspections, tests and hold points for each activity and who approves them.
  • MarbleA natural stone used for floors, walls and stairs, requiring periodic surface protection.
  • Inspection request (IR)A formal request from the contractor to the consultant to inspect work before the next stage.

Read next

Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote