Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Snag list (punch list)

قائمة الملاحظات

A list of incomplete or defective items to be completed before final handover.

Category: Safety & quality

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A snag list records defects and incomplete items before handover, such as paint scratches, a cracked tile or a door that will not close, with the location of each and who fixes it.

Why it matters on a project

A clear list with photos and locations speeds up handover and avoids arguments over what was fixed and what remains.

Common mistake

Writing general notes like 'improve painting' without naming the room and wall.

Frequently asked questions

Who prepares the snag list?

The consultant or owner during the pre-handover inspection; the contractor can prepare an internal one first.

How is it tracked?

Each item gets a number, location, photo, close-out date and the reviewer's signature.

Related terms

  • Handover certificateA document evidencing the client’s acceptance of the works and start of the defects period.
  • Defects liability periodThe period after handover during which the contractor must repair defects at its own cost.
  • NCR (non-conformance report)A report recording work or material not meeting the specification, with root cause and corrective action.
  • Quality control planThe list of inspections, tests and hold points for each activity and who approves them.

Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote