Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Aluminium composite cladding is two thin aluminium skins bonded to a core, folded and fixed to a frame to clad facades with a modern look.
Why it matters on a project
The core type is the key specification item: a fire-resistant core is required on many buildings under the fire code.
Measurement and pricing
Measured in square metres of clad facade, including frame and joints.
Common mistake
Choosing a plain plastic-core panel because it is cheaper on a building that requires a fire-resistant core.
Frequently asked questions
What is the difference between standard, FR and non-combustible cores?
Standard is plastic, FR has a high mineral content for fire resistance, and a mineral core is non-combustible; the code decides which is required.
What is a common panel thickness?
4 mm is common on facades, with 0.3 to 0.5 mm aluminium skins.
Related terms
- HPL claddingHigh-pressure laminate panels resistant to weathering, used for facade cladding.
- Elevation (facade)A drawing of the building’s external face showing openings, materials and heights.
- Flexible polyurea sealantA flexible joint filler tolerating movement and chemicals, used in industrial floors.
- Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.
Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote