Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Waterjet cutting

قطع بالماء

Cutting marble and tiles with a high-pressure water jet to produce precise shapes and patterns.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Waterjet cutting cuts marble, stone and metal with a high-pressure water jet mixed with abrasive grit, following a digital path from a drawing file.

Why it matters on a project

It allows very precise inlaid floors and patterns, provided the cutting file is drawn accurately and matches site dimensions.

Measurement and pricing

Usually priced per linear metre of cut or per piece depending on complexity.

Common mistake

Cutting from an approximate drawing before taking real site measurements, so pieces do not fit.

Frequently asked questions

What file format does waterjet cutting need?

Usually a DWG or DXF with closed lines at true size.

Can waterjet cut glass and metal?

Yes, it cuts stone, metal, glass and ceramics with settings suited to each material.

Related terms

  • MarbleA natural stone used for floors, walls and stairs, requiring periodic surface protection.
  • Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.
  • Porcelain tilesHigh-density, low-absorption ceramic tiles suited to heavy-use floors.
  • Gypsum ornamentClassical decorative elements cast in gypsum for ceilings, cornices and internal columns.

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote