Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Epoxy flooring

أرضيات الإيبوكسي

A resin floor coating for warehouses, car parks and commercial kitchens.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Epoxy flooring is layers of epoxy resin applied to concrete to give a jointless surface that resists wear, oil and chemicals and is easy to clean.

Why it matters on a project

Success depends more on concrete moisture and surface preparation than on the product. Damp concrete causes blistering and debonding.

Measurement and pricing

Measured in square metres, stating system and thickness.

Common mistake

Applying it on new concrete that has not dried or without mechanical surface preparation.

Frequently asked questions

How thick is epoxy flooring?

From thin coatings under a millimetre to self-levelling systems of several millimetres, depending on use and loads.

Is epoxy suitable outdoors?

Standard epoxy yellows under UV; outdoors a UV-resistant topcoat such as polyurethane is used.

Related terms

  • Surface preparationCleaning a steel surface to a specified grade (e.g. SSPC-SP 10) before coating to ensure adhesion.
  • Dry film thickness (DFT)The thickness of a coating after drying, measured in microns and checked against the specification.
  • Floor screedA thin mortar or concrete layer that levels the floor before tiles or parquet.
  • Steel structureA structural frame of steel sections connected by welding or bolts, protected from corrosion by coating.

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote