Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Dry film thickness (DFT)

سماكة الطبقة الجافة

The thickness of a coating after drying, measured in microns and checked against the specification.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Dry film thickness is the thickness of paint once dry, measured in microns with a gauge, and set for each coat of the paint system.

Why it matters on a project

Too thin shortens corrosion protection; too thick can crack. Measurement is the only proof the work matches the specification.

Measurement and pricing

Multiple readings per area are recorded in the inspection report.

Worked example

A three-coat system: primer 75 + intermediate 125 + finish 75 microns = 275 microns total dry film thickness.

Common mistake

Measuring only a few easy-to-reach spots and leaving edges and corners unchecked.

Frequently asked questions

What is the difference between wet and dry film thickness?

Wet is measured while applying, dry after curing; the ratio depends on the paint's solids content.

How many readings per area?

The specification or reference standard sets them, with extra readings at edges and corners.

Related terms

  • Surface preparationCleaning a steel surface to a specified grade (e.g. SSPC-SP 10) before coating to ensure adhesion.
  • Steel structureA structural frame of steel sections connected by welding or bolts, protected from corrosion by coating.
  • Quality control planThe list of inspections, tests and hold points for each activity and who approves them.
  • Inspection request (IR)A formal request from the contractor to the consultant to inspect work before the next stage.

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote