Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Travertine is a natural limestone formed from spring deposits, known for small pores and voids and a warm beige colour. It comes filled, with the pores filled with paste, or unfilled with a rough natural look, in polished, honed or tumbled finishes.
Why it matters on a project
It brings a warm character sought in modern interiors, but it is porous and etched by acids such as lemon and strong cleaners, so it needs sealing and the right location.
Measurement and pricing
Per square metre for floors and cladding, skirting per linear metre, and worktops per linear metre or per piece.
Common mistake
Using unfilled travertine on a kitchen worktop without a stain-resistant sealer.
Frequently asked questions
Is travertine suitable for bathrooms?
Yes if it is filled and sealed, avoiding acidic cleaners.
How does it differ from marble?
Travertine is a porous limestone in warm beige; marble is denser and takes a higher polish.
Related terms
- MarbleA natural stone used for floors, walls and stairs, requiring periodic surface protection.
- Porcelain tilesHigh-density, low-absorption ceramic tiles suited to heavy-use floors.
- SkirtingA strip at the base of the wall that protects the wall-floor junction.
- Stone claddingCovering facades with natural stone panels fixed to the building.
Read next
Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote