Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Corner bead

زوايا اللياسة

Metal or PVC angles fixed on corners before plastering.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Corner beads are galvanised steel or PVC profiles fixed on external corners of walls, columns, and door and window openings, giving a straight arris and protecting the corner from damage.

Why it matters on a project

They make the difference between wavy hand-formed corners and clean straight ones, and cut corner repairs before painting.

Measurement and pricing

In linear metres, or included in the plaster rate, according to the contract's method of measurement.

Common mistake

Using ungalvanised steel beads in damp areas, so rust shows through the paint.

Frequently asked questions

Galvanised or PVC?

PVC does not rust and suits damp areas; galvanised is stronger on corners exposed to knocks.

Are they used on gypsum board?

Yes, with board-specific profiles fixed before jointing compound.

Related terms

  • Plaster (render)A cement or gypsum layer applied to walls to level them before paint or cladding.
  • Gypsum plasterA ready-mixed internal gypsum plaster with a smooth finish.
  • Emulsion paintWater-based paint for internal walls and ceilings, in various sheen levels.
  • Method of measurementThe agreed rules for measuring each BOQ item.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote