Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Joint sealant

مواد سد الفواصل

Flexible materials that seal joints and take their movement.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Joint sealants such as silicone, polyurethane and polysulphide seal joints between different materials, expansion joints, and around sanitary ware and windows. They sit on a foam backer rod at a depth suited to the joint width, often about half the width.

Why it matters on a project

A well-sealed joint keeps out water and dust; the wrong material cracks or debonds within a year.

Measurement and pricing

In linear metres, stating joint size and material.

Worked example

A 20 mm expansion joint: sealant about 10 mm deep over a backer rod; a 30 m joint means 30 linear metres of sealant and rod.

Common mistake

Filling an expansion joint with mortar or ordinary silicone without a backer rod, so it cracks at the first movement.

Frequently asked questions

Silicone or polyurethane?

Silicone around sanitary ware and glass; polyurethane for floor and facade joints that move.

Why a backer rod?

It sets the sealant depth and stops it bonding to the joint base, so it moves freely.

Related terms

  • Expansion jointA joint allowing the building to expand and contract thermally without cracking.
  • Flexible polyurea sealantA flexible joint filler tolerating movement and chemicals, used in industrial floors.
  • Aluminium windowsWindows with aluminium frames, sliding or hinged, single or double glazed.
  • Sanitary wareWCs, basins, mixers, showers and accessories.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote