Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Sanitary ware

الأدوات الصحية

WCs, basins, mixers, showers and accessories.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Sanitary ware covers WCs, basins, baths, showers, mixers, taps and accessories, including wall-hung WCs with concealed cisterns and floor-standing types, chosen for use, space and water consumption.

Why it matters on a project

It shapes daily comfort and water use. Concealed fittings need the models fixed before plaster and tiling.

Measurement and pricing

By number for each type including supply and installation, with concealed cisterns counted with wall-hung WCs.

Common mistake

Running supply and drainage pipes before choosing models, so outlets do not match the selected pieces.

Frequently asked questions

What are the benefits of a wall-hung WC?

Easier floor cleaning, a cleaner look and a quiet concealed cistern, but it needs a frame in the wall.

When should I choose sanitary ware?

Before plumbing rough-in, because outlet positions vary between models.

Related terms

  • MEP drawingsElectrical, plumbing, HVAC and fire drawings.
  • Porcelain tilesHigh-density, low-absorption ceramic tiles suited to heavy-use floors.
  • Material submittalA request to approve a material or product with manufacturer data and samples before supply.
  • Snag list (punch list)A list of incomplete or defective items to be completed before final handover.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote