Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Kitchen cabinets are base units, wall units and tall units, with carcasses usually in moisture-resistant particleboard or plywood, fronts in acrylic, HPL, timber or paint, worktops in quartz, granite or marble, and fittings and hinges.
Why it matters on a project
The kitchen is one of the costliest finishing items per metre, and a carcass that is not moisture resistant under the sink fails within a few years.
Measurement and pricing
Base and wall units per linear metre, worktops per linear or square metre, appliances by number.
Common mistake
Measuring and making the kitchen before tiling and plaster are finished, so actual dimensions differ.
Frequently asked questions
What is the best carcass material?
Marine plywood or moisture-resistant particleboard, especially for the sink unit.
Quartz or marble worktop?
Quartz absorbs less and is easier to maintain; marble is beautiful but marks with acids and stains.
Related terms
- HPL claddingHigh-pressure laminate panels resistant to weathering, used for facade cladding.
- MarbleA natural stone used for floors, walls and stairs, requiring periodic surface protection.
- Furniture layoutA plan showing furniture positions, sizes and circulation space.
- Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.
Read next
Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote