Category: Design
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A furniture layout is a plan showing fixed and loose furniture at real sizes, circulation space around it, and its relation to doors, windows, power outlets and AC.
Why it matters on a project
It shows early whether a room fits what the owner wants, and fixes the exact positions of outlets and lights. Electrical design without it puts sockets behind wardrobes.
Measurement and pricing
Furniture by number, fixed joinery in linear metres or by number per the description.
Common mistake
Drawing furniture at rough library sizes instead of the supplier's real dimensions, so pieces do not fit.
Frequently asked questions
How much space around a dining table?
About 90 to 100 cm behind chairs to pull out and pass.
Does the furniture layout come before electrical design?
Yes, it fixes the positions of sockets, lights, TV and AC units.
Related terms
- Floor planA drawing of a floor as if cut horizontally at about one metre.
- MEP drawingsElectrical, plumbing, HVAC and fire drawings.
- 3D visualisation (rendering)Realistic images of the design produced from a 3D model for presentation and approval.
- Reflected ceiling planA drawing of suspended ceilings, their levels, lights and diffusers.
Read next
Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote