Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Wallpaper

ورق الجدران

A wall covering of paper, vinyl or fabric.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Wallpaper is a covering glued to internal walls, made of paper, vinyl, fabric or fibre in many patterns, colours and textures. Vinyl types resist moisture and cleaning better.

Why it matters on a project

It gives character quickly at a reasonable cost, but needs a perfectly level and dry wall or defects and bubbles show.

Measurement and pricing

Per square metre of wall, or by number of rolls with waste for pattern matching.

Worked example

A wall 4 m wide and 3 m high with 0.53 × 10 m rolls: drops 4 ÷ 0.53 = 7.6, so 8 drops; each roll gives 3 drops of 3 m, so 8 ÷ 3 = 2.7, or 3 rolls, more if the pattern repeat is large.

Common mistake

Hanging on damp putty or plaster, so it lifts or stains form underneath.

Frequently asked questions

Is wallpaper suitable for bathrooms?

Moisture-rated vinyl works away from direct spray; tiles are better in shower zones.

Can I paint over wallpaper?

Not recommended; strip it, prepare the wall, then paint.

Related terms

  • Putty (skim coat)A thin smooth layer over plaster preparing the surface for paint.
  • Surface preparationCleaning a steel surface to a specified grade (e.g. SSPC-SP 10) before coating to ensure adhesion.
  • Plaster (render)A cement or gypsum layer applied to walls to level them before paint or cladding.
  • Waste allowanceA percentage added to material quantities to cover cutting, damage and site loss.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote