Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Mortar

المونة

A mix of cement, sand and water for blockwork and plaster.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Mortar is a mix of cement, sand and water, sometimes with additives, used to lay blocks, plaster and screed. The mix ratio follows the specification for each use; blockwork commonly uses about 1 cement to 4 sand.

Why it matters on a project

Salty or clayey sand and excess water weaken mortar and cause efflorescence and cracks. Factory pre-mixed mortar gives more consistent quality.

Measurement and pricing

Usually not measured on its own but included in the blockwork or plaster rate.

Common mistake

Mixing a large batch in the morning and re-tempering it with water after midday, though it has started to set.

Frequently asked questions

Is pre-mixed mortar better?

More consistent and less wasteful, at a slightly higher cost than site mixing.

Which sand should be used?

Clean sand free from clay and salts, tested if the source is unknown.

Related terms

  • BlockworkBuilding walls with solid, hollow or insulated concrete blocks.
  • Plaster (render)A cement or gypsum layer applied to walls to level them before paint or cladding.
  • Floor screedA thin mortar or concrete layer that levels the floor before tiles or parquet.
  • Tile adhesiveA modified cementitious mortar that fixes tiles instead of traditional mortar.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote