Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Method of measurement

طريقة القياس

The agreed rules for measuring each BOQ item.

Category: Quantities & pricing

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A method of measurement is the set of rules for how each quantity is measured: what openings are deducted, the unit, and what is included in an item without separate measurement. Well-known ones include POMI, NRM and CESMM.

Why it matters on a project

A clear method in the contract prevents disputes at payment over what is and is not paid.

Common mistake

Deducting small openings in the take-off when the method says not to, or the reverse.

Frequently asked questions

Which method of measurement is used in Saudi Arabia?

The contract decides; POMI is common in the region and NRM on some projects, and the one named in the documents applies.

What if the contract names none?

Agree one in writing before pricing, or it becomes a dispute at every payment.

Related terms

Read next

Does your project need quantity take-off and BOQ pricing? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote