Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Gypsum plaster

اللياسة الجبسية

A ready-mixed internal gypsum plaster with a smooth finish.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Gypsum plaster is a ready-mixed internal plaster based on gypsum, usually applied in one coat on blockwork or concrete, giving a smooth level surface ready for skim or paint. It dries faster than cement plaster.

Why it matters on a project

It shortens internal finishing and reduces hairline cracks, but it is not for wet or external areas.

Measurement and pricing

Per square metre of walls and ceilings with large openings deducted.

Common mistake

Using it in bathrooms and kitchens behind tiles or on facades, where moisture affects it.

Frequently asked questions

Does gypsum plaster need skim?

Its surface is smooth; a light skim or primer may be enough before paint, depending on workmanship.

Can it be used on concrete ceilings?

Yes, after a suitable bonding coat on smooth concrete.

Related terms

  • Plaster (render)A cement or gypsum layer applied to walls to level them before paint or cladding.
  • Putty (skim coat)A thin smooth layer over plaster preparing the surface for paint.
  • Emulsion paintWater-based paint for internal walls and ceilings, in various sheen levels.
  • Surface preparationCleaning a steel surface to a specified grade (e.g. SSPC-SP 10) before coating to ensure adhesion.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote