Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Terrazzo

التيرازو

Flooring of marble or stone chips in a cement or epoxy binder.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Terrazzo is flooring of marble, stone or glass chips in a cement or epoxy binder, poured in place or supplied as tiles, then ground and polished. It is very durable and allows many patterns and colours.

Why it matters on a project

It takes heavy traffic for decades, suiting airports, hospitals, schools and lobbies. Its initial cost is higher but maintenance lower.

Measurement and pricing

Per square metre including pouring or laying, grinding and polishing, with brass divider strips per linear metre.

Common mistake

Pouring terrazzo on an unstable screed, so the screed's cracks come through the surface.

Frequently asked questions

Is terrazzo suitable for homes?

Yes, and it is back in modern design, though more common in public buildings for its durability.

Cement or epoxy terrazzo?

Epoxy is thinner, lighter and more varied in colour; cement is thicker and cheaper.

Related terms

  • MarbleA natural stone used for floors, walls and stairs, requiring periodic surface protection.
  • Floor screedA thin mortar or concrete layer that levels the floor before tiles or parquet.
  • Epoxy flooringA resin floor coating for warehouses, car parks and commercial kitchens.
  • Porcelain tilesHigh-density, low-absorption ceramic tiles suited to heavy-use floors.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote