Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Anti-slip flooring is tile or finish with a textured surface rated for slip resistance, such as the German R rating from R9 to R13, where a higher number means more resistance. It is used around pools, bathrooms, external entrances, ramps and commercial kitchens.
Why it matters on a project
Slips are among the most common injuries in buildings, and polished tiles by a pool or entrance are a real danger to children and older people.
Measurement and pricing
Per square metre like other tiles, stating the required rating in the description.
Common mistake
Choosing polished tiles for external entrances and parking ramps for looks, so they become slippery with water and dust.
Frequently asked questions
What rating suits pool surrounds?
Ratings for barefoot wet areas are usually used, set by the designer and tile supplier.
Is matt tile automatically anti-slip?
Not necessarily; rely on the rating on the product certificate.
Related terms
- Porcelain tilesHigh-density, low-absorption ceramic tiles suited to heavy-use floors.
- Interlocking pavingInterlocking concrete blocks for yards, paths and parking.
- StaircaseA concrete or steel element linking floors with risers, treads and landings.
- Risk assessmentIdentifying hazards in each activity, estimating likelihood and severity and setting controls before work starts.
Read next
Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote