Cantilever

كابولي

A structural element fixed at one end and free at the other, such as balconies and canopies.

Category: Structure & materials

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A cantilever is a structural element fixed at one end and free at the other, such as a projecting balcony or an entrance canopy.

Why it matters on a project

Its main reinforcement is at the top, not the bottom as in ordinary slabs; misplacing it leads to sagging or failure.

Common mistake

Striking the formwork under the cantilever too early, before the concrete gains strength.

Frequently asked questions

How far can a cantilever project?

The structural design sets it by thickness and load; it is never extended on site without calculation.

Why does a cantilever crack at the top?

Tension is at the top, so any shortage or sagging of the top bars shows as cracks at the support.

Related terms

  • Solid slabA concrete slab of uniform thickness without voids, common for small and medium spans.
  • Reinforcement (rebar)Steel bars placed inside concrete per bar-bending schedules to strengthen structural elements.
  • Steel structureA structural frame of steel sections connected by welding or bolts, protected from corrosion by coating.
  • Reinforced concreteConcrete containing steel reinforcement to resist the tensile forces concrete alone cannot carry.