Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Concept design

التصميم المفاهيمي

The first design stage: idea, massing and general layout without construction detail.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Concept design is the first stage after the brief: space planning, overall massing, orientation and the facade idea, shown in preliminary plans and simple views that are enough to decide on.

Why it matters on a project

Changing the idea at this stage is cheap; changing it after construction drawings is expensive, so the big decisions are made here.

Measurement and pricing

Usually a share of the full design fee and often the first payment stage.

Common mistake

Jumping into details and material choices before the space plan is approved.

Frequently asked questions

How many revision rounds are in concept design?

The contract sets them, usually two or three; extra rounds are charged separately.

Is concept design enough for a building permit?

Usually not; the permit needs more detailed architectural and structural drawings that meet municipal requirements.

Related terms

  • Design briefA document defining the client’s requirements, spaces, functions and budget before design starts.
  • 3D visualisation (rendering)Realistic images of the design produced from a 3D model for presentation and approval.
  • Construction drawingsDetailed drawings used to build the work on site after design approval, including dimensions, levels and details.
  • Elevation (facade)A drawing of the building’s external face showing openings, materials and heights.

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote