Definition

Building Information Modelling is a way of working in which the project is built as one 3D model where every element carries its data: material, size, quantity and phase. All disciplines share it.

Why it matters on a project

It catches clashes between structure, HVAC and plumbing before construction and takes quantities straight from the model instead of manual take-off.

Common mistake

Calling any 3D model BIM, when the point is that it carries data that can be extracted and coordinated.

Frequently asked questions

Does a villa project need BIM?

Not necessarily, but it helps on large villas with dense services, to catch clashes and extract quantities.

Which software is used for BIM?

Revit for modelling and Navisworks for clash detection are the most common, with IFC for exchanging models.

Related terms

  • Construction drawingsDetailed drawings used to build the work on site after design approval, including dimensions, levels and details.
  • Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.
  • Quantity take-offExtracting quantities from drawings under defined measurement rules, with a reference for every figure.
  • 3D visualisation (rendering)Realistic images of the design produced from a 3D model for presentation and approval.

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote