Construction drawings

مخططات تنفيذية

Detailed drawings used to build the work on site after design approval, including dimensions, levels and details.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Construction drawings are the set the project is actually built from: plans, sections, elevations and architectural, structural and MEP details with enough dimensions, levels and specifications for the contractor to work without guessing.

Why it matters on a project

Anything missing from them turns on site into an RFI, a variation or a defect. A complete set before award also makes contractor bids comparable.

Measurement and pricing

Usually priced per square metre of built-up area or as a lump sum, depending on disciplines and level of detail.

Common mistake

Starting work from the building-permit drawings alone, which do not carry enough detail to build from.

Frequently asked questions

What is the difference between permit drawings and construction drawings?

Permit drawings are enough for municipal approval and show the general layout and areas; construction drawings add the dimensions, levels, details and specifications needed to build.

Which disciplines do construction drawings cover?

Architecture, structure, electrical, HVAC, plumbing and fire protection, and sometimes landscape and interiors depending on the project.

Related terms

  • Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.
  • As-built drawingsDrawings updated to match what was actually built, handed over in the close-out file.
  • SectionA drawing showing the building as if cut vertically to reveal floors, heights and internal details.
  • Elevation (facade)A drawing of the building’s external face showing openings, materials and heights.
  • Bill of quantities (BOQ)A list of work items with description, unit and quantity, priced item by item.

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote