Category: Safety & quality
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A lifting plan sets out, before any significant lift, the load weight and centre of gravity, the crane type and its capacity at the required radius, the lifting gear, the crane position and ground stability, the exclusion zone, and the people and signals involved.
Why it matters on a project
Lifting incidents are among the most serious on site. A written plan is required on most large and government projects before a lifting permit is issued.
Common mistake
Choosing a crane by its maximum rated capacity without checking the load chart at the actual radius, exceeding the safe load.
Frequently asked questions
When is a lift critical?
When the load is a large share of the crane's capacity, two cranes are used, or it is near power lines or people.
Who prepares the lifting plan?
A competent lifting supervisor with the crane operator and safety officer, approved by the site manager.
Related terms
- Permit to workWritten authorisation for hazardous work (hot work, work at height, confined spaces) under set conditions.
- Third-party inspectionIndependent testing by an accredited body separate from contractor and owner.
- Method statementA step-by-step description of how an activity will be carried out safely and to specification.
- Risk assessmentIdentifying hazards in each activity, estimating likelihood and severity and setting controls before work starts.
Read next
Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote