Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Method statement

بيان طريقة العمل

A step-by-step description of how an activity will be carried out safely and to specification.

Category: Safety & quality

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A method statement explains the steps for a specific activity: plant, labour, sequence, inspection points and safety measures, and is approved by the consultant before work.

Why it matters on a project

It gives the whole team one understanding of how the work is done and exposes problems on paper before site.

Common mistake

Writing a generic statement that does not name the project's actual plant, people and specifications.

Frequently asked questions

How is a method statement different from a risk assessment?

The method statement explains how the work is done; the risk assessment sets out what could cause harm and how it is controlled. They usually go together.

Does every activity need its own statement?

Main and high-risk activities do; simple repeated tasks can share one.

Related terms

  • Risk assessmentIdentifying hazards in each activity, estimating likelihood and severity and setting controls before work starts.
  • Quality control planThe list of inspections, tests and hold points for each activity and who approves them.
  • Inspection request (IR)A formal request from the contractor to the consultant to inspect work before the next stage.
  • Permit to workWritten authorisation for hazardous work (hot work, work at height, confined spaces) under set conditions.

Read next

Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote