Category: Structure & materials
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Termite treatment is spraying the soil under foundations and the ground slab with an approved termiticide before pouring, forming a barrier that keeps termites from timber and finishes.
Why it matters on a project
Treating after finishing is hard and costly, while treating before the pour is cheap. A warranty certificate from the applicator is usually required.
Measurement and pricing
Measured in square metres of treated area.
Worked example
A 250 m² ground floor: 250 m² is treated under the slab, plus foundation sides per the applicator's specification.
Common mistake
Spraying and then leaving the soil exposed for days or disturbing it again before the pour.
Frequently asked questions
When is termite treatment applied?
After backfilling and compaction, just before the polythene and the ground slab pour.
How long is the warranty?
The applicator states it in the warranty certificate, kept with the building records.
Related terms
- BackfillRefilling excavations around foundations with suitable soil in compacted layers.
- Footings (foundations)Structural elements that transfer the building loads to the soil.
- Parquet (wood flooring)Natural or engineered wood flooring laid over an underlay.
- WaterproofingLayers preventing water ingress into structural elements or spaces, such as bituminous membranes and cementitious coatings.
Does your project need structural design and reinforcement drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote