Footings (foundations)

قواعد

Structural elements that transfer the building loads to the soil.

Category: Structure & materials

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Footings carry column loads down to the soil. Villas usually have isolated footings under each column; combined footings or a raft are used depending on soil and loads.

Why it matters on a project

Footing size comes from the bearing capacity in the soil report. Guessing sizes without a soil report is a risk that only shows after settlement and cracking.

Measurement and pricing

Concrete in cubic metres, excavation and backfill in cubic metres, waterproofing in square metres.

Worked example

A 2.00 × 2.00 m footing 0.60 m deep = 2.40 m³; 12 identical footings = 28.80 m³ of concrete.

Common mistake

Pouring on uncompacted or waterlogged soil, or without a blinding layer under the footing.

Frequently asked questions

When is a raft used instead of isolated footings?

When soil is weak or loads are high so footings would overlap; the engineer decides from the soil report.

How deep are villa footings?

The soil report and the level of the suitable bearing layer decide it; there is no fixed depth for every plot.

Related terms

  • Ground beam (tie beam)A ground-level beam tying the footings and carrying walls at ground level.
  • Reinforced concreteConcrete containing steel reinforcement to resist the tensile forces concrete alone cannot carry.
  • WaterproofingLayers preventing water ingress into structural elements or spaces, such as bituminous membranes and cementitious coatings.
  • LevelThe vertical height of a point relative to a datum (zero level).

Read next

  • Work out quantities with our free calculators: concrete, tiles, paint and plaster. Open the calculators

Does your project need structural design and reinforcement drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote