Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Detail drawing

اللوحة التفصيلية

A large-scale drawing showing how a specific part is built.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A detail drawing is drawn at a large scale such as 1:5, 1:10 or 1:20 and shows how to build a part that plans and sections cannot show clearly, such as waterproofing turning up a parapet, stone cladding fixing, or a stair and handrail detail.

Why it matters on a project

Most leaks and cracks start at details nobody drew. A good detail sets materials, thicknesses and layer order so nothing is improvised on site.

Common mistake

Issuing villa drawings with plans and elevations only, leaving waterproofing, parapet and lintel details to the site.

Frequently asked questions

Which details matter most in villa drawings?

Waterproofing at parapets and bathrooms, lintels, stairs and facade fixing.

Are details part of construction drawings?

Yes, they are what separates construction drawings from permit drawings.

Related terms

  • Construction drawingsDetailed drawings used to build the work on site after design approval, including dimensions, levels and details.
  • SectionA drawing showing the building as if cut vertically to reveal floors, heights and internal details.
  • Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.
  • ParapetA low wall around a roof or terrace.

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote