Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Title block

إطار اللوحة وبياناتها

The sheet's data box: project, number, scale and revision.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

The title block is the fixed panel on every engineering sheet. It holds the project, owner and office names, the sheet title and number, scale and date, revision number, and the names of the designer, checker and approver.

Why it matters on a project

It tells you which copy is current. A sheet without a clear revision number can be built from an old copy.

Common mistake

Changing a sheet without updating its revision number and date, leaving two different versions with the same number on site.

Frequently asked questions

What goes in the title block?

Project, owner and office, sheet title and number, scale and date, revision and signatures.

Why does the revision number matter?

It identifies the approved copy and stops work from an old one.

Related terms

  • Drawing revisionA number and date that identify each changed version of a drawing.
  • Construction drawingsDetailed drawings used to build the work on site after design approval, including dimensions, levels and details.
  • Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.
  • As-built drawingsDrawings updated to match what was actually built, handed over in the close-out file.

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote