Retention

احتجاز الضمان

A percentage withheld from each payment and released after handover or the defects period.

Category: Contracts & management

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Retention is a percentage deducted from each payment and held by the owner as security for remedying defects; part is released at handover and the rest after the defects period.

Why it matters on a project

It hits the contractor's cash flow directly, so release dates are tracked as a separate financial item.

Measurement and pricing

Set in the contract as a percentage of each payment.

Worked example

A 500,000 SAR payment with 10% retention: 50,000 SAR is held and 450,000 paid.

Common mistake

Forgetting to claim release of retention after the defects period ends.

Frequently asked questions

Is there a cap on retention?

Contracts usually cap it at a percentage of the contract value, after which deductions stop.

When is retention released?

Part at taking-over and the rest after the defects period and repairs, per the contract.

Related terms

  • Payment application (IPC)A periodic payment request based on approved progress and executed quantities.
  • Defects liability periodThe period after handover during which the contractor must repair defects at its own cost.
  • Handover certificateA document evidencing the client’s acceptance of the works and start of the defects period.
  • As-built drawingsDrawings updated to match what was actually built, handed over in the close-out file.

Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote