Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Sound insulation

العزل الصوتي

Reducing sound passing between rooms and floors.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Sound insulation reduces sound passing through walls, ceilings and floors, by adding mass or layers such as rock wool inside partitions, separating floors with a resilient layer, and sealing gaps around services.

Why it matters on a project

It matters between bedrooms, majlis, cinema rooms and adjoining flats. Adding it after finishing is costly and less effective.

Measurement and pricing

In square metres by type and thickness.

Common mistake

Insulating the wall well but leaving gaps around pipes and doors unsealed, so sound leaks through them.

Frequently asked questions

Sound insulation or acoustic treatment?

Insulation stops sound passing between rooms; treatment reduces echo inside a room.

Is wool inside the partition enough?

It helps a lot, but gaps and doors must be sealed too.

Related terms

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote