Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

SPC flooring

أرضيات SPC

Click flooring planks with a waterproof stone-plastic core.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

SPC flooring is a plank with a core of stone powder and plastic, a printed layer and a wear layer, laid as click flooring over the existing floor, usually without glue.

Why it matters on a project

It is waterproof and more stable than wood parquet, and fast to lay over old tiles in renovation, though quality varies widely with the wear layer thickness.

Measurement and pricing

In square metres including underlay, skirting and transition strips.

Common mistake

Laying it over an uneven floor without levelling, so the joints open and click.

Frequently asked questions

Is SPC suitable for kitchens?

Yes, it is waterproof, with edges sealed at the walls.

What wear layer thickness?

About 0.3 mm usually suits homes, and 0.5 mm or more for busy commercial areas.

Related terms

  • Vinyl flooringFlexible plastic flooring in sheets or planks.
  • Parquet (wood flooring)Natural or engineered wood flooring laid over an underlay.
  • Floor screedA thin mortar or concrete layer that levels the floor before tiles or parquet.
  • SkirtingA strip at the base of the wall that protects the wall-floor junction.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote