Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Glass partition

القواطع الزجاجية

Internal walls of toughened glass that divide offices and spaces.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Glass partitions are internal walls of toughened or laminated glass, commonly 10 to 12 mm, with slim aluminium frames or frameless, and glass or timber doors. They are used in offices, clinics and showrooms.

Why it matters on a project

They bring daylight and a sense of space with some sound separation. Real acoustic privacy needs double or laminated glass.

Measurement and pricing

Per square metre including glass and frames, doors by number, and manifestation film per square metre.

Common mistake

Measuring glass before floors and ceilings are finished, so the actual height differs and the fabricated glass does not fit.

Frequently asked questions

Why must the glass be toughened?

It is stronger and breaks into small blunt pieces, a safety requirement for partitions and doors.

How can I add privacy?

With frosted film, sandblasted glass, blinds, or switchable smart glass.

Related terms

  • Double glazingTwo glass panes with an air or gas gap to insulate heat and sound.
  • Aluminium windowsWindows with aluminium frames, sliding or hinged, single or double glazed.
  • Suspended (false) ceilingA secondary ceiling hung below the structural slab to conceal services and improve acoustics and lighting.
  • Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote