Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Double glazing

الزجاج المزدوج

Two glass panes with an air or gas gap to insulate heat and sound.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Double glazing is a unit of two glass panes with a sealed gap of dry air or argon, commonly 6 mm glass, 12 mm gap and 6 mm glass. A low-emissivity (Low-E) coating cuts incoming heat considerably.

Why it matters on a project

Windows are the weakest point in thermal insulation. The energy code sets heat transfer values for windows, and double glazing with Low-E is the usual way to meet them.

Measurement and pricing

Per square metre by build-up, thicknesses and coating, usually within the window price.

Common mistake

Fitting the Low-E coating on the wrong face of the unit, so its benefit drops.

Frequently asked questions

Does double glazing reduce noise?

It helps, and more so with panes of different thickness or laminated glass.

What does 6-12-6 mean?

A 6 mm pane, a 12 mm gap and a second 6 mm pane.

Related terms

  • Aluminium windowsWindows with aluminium frames, sliding or hinged, single or double glazed.
  • Thermal insulationMaterials reducing heat transfer through walls and roofs, required by the Saudi Building Code.
  • Saudi Building Code (SBC)The mandatory design and construction requirements in Saudi Arabia.
  • Material submittalA request to approve a material or product with manufacturer data and samples before supply.

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote