Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Starter bars

أشاير الأعمدة

Bars left projecting from a cast element to lap with the next one.

Category: Structure & materials

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Starter bars are fixed in a footing or slab before the pour and left projecting, to lap with the bars of the next column or wall over the lap length set in design. They are tied firmly in place with stirrups so they do not move during the pour.

Why it matters on a project

Misplaced or short starters are among the most common column inspection problems. Fixing them after the pour means drilling, epoxy-anchored bars and the designer's approval.

Common mistake

Pouring the footing with column starters not tied with stirrups, so the vibrator pushes them and the column ends up off its gridline.

Frequently asked questions

What if starter bars are short?

Do not weld or extend them without the designer's approval; the fix is usually epoxy-anchored bars to a length the designer sets.

What is checked on starter bars?

Number, diameter, position on the gridline, projection length and fixing before the pour.

Related terms

Read next

Does your project need structural design and reinforcement drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote