Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Concrete spacers

بسكويت الخرسانة

Small blocks holding steel off the formwork to keep the cover.

Category: Structure & materials

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Spacers are concrete or plastic blocks of the required cover thickness, tied to or placed under the reinforcement to keep a fixed gap between steel and formwork or ground. Top steel in slabs sits on chairs.

Why it matters on a project

Without them steel touches the formwork, shows after striking, or ends up with thin cover that rusts within years.

Common mistake

Using broken bricks or stones under the steel instead of spacers; they crack or absorb water and become weak points.

Frequently asked questions

Plastic or concrete spacers?

Concrete suits elements against soil and moisture; plastic is common in slabs and internal walls.

How far apart should spacers be?

Per bar size and specification; the point is that the steel does not sag between them.

Related terms

  • Concrete coverThe concrete thickness between the surface and the nearest bar.
  • Reinforcement (rebar)Steel bars placed inside concrete per bar-bending schedules to strengthen structural elements.
  • Pre-pour checklistChecking steel, formwork and services before a pour is approved.
  • FormworkTemporary moulds that hold concrete until it hardens.

Read next

Does your project need structural design and reinforcement drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote