Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Emergency response plan

خطة الطوارئ

Written procedures for fire, injury and major incidents on site.

Category: Safety & quality

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

An emergency response plan sets out what to do in a fire, serious injury, partial collapse or gas leak: emergency numbers, evacuation wardens, escape routes and assembly point, nearest hospital, first aid and fire fighting resources, and regular training and drills.

Why it matters on a project

In an emergency there is no time to think. A plan tested by drills saves minutes that can save a life.

Common mistake

Writing an emergency plan without a single evacuation drill, so everyone discovers during an incident that exits are blocked by materials.

Frequently asked questions

How often are evacuation drills held?

The safety system sets it, usually periodically during the project and when major work stages change.

Where is the emergency plan posted?

At entrances, offices and assembly points, with emergency numbers in the workers' languages.

Related terms

  • HSE planThe document setting out how health, safety and environment are managed.
  • First aidImmediate care for an injured person on site until medical help arrives.
  • Site housekeepingKeeping the site tidy and clear of waste and obstructions.
  • Safety signsSigns with standard colours and symbols for prohibition, warning, mandatory and guidance.

Read next

Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote