Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Site plan

الموقع العام

A drawing showing the building within the plot with setbacks, entrances and levels.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

The site plan shows the plot boundaries and dimensions, the building's position within them, setbacks, entrances and parking, boundary walls, ground and street levels, and the location of tanks, electrical rooms and drainage.

Why it matters on a project

It is the first drawing the permitting authority checks, and it ties the design to the ground. Its errors carry into setting out and show up in excavation or the entrance level.

Measurement and pricing

It gives the boundary wall length, external paving and planting areas and excavation, each priced in the BOQ in its own unit.

Common mistake

Drawing the site plan without a recent survey of the plot, so dimensions or levels differ on site.

Frequently asked questions

What is the difference between a site plan and a survey?

The survey records the plot as it is with dimensions and levels, and the site plan places the design on it.

Does the site plan need a set scale?

It is usually drawn at 1:100 or 1:200 depending on plot size, with north point and street names.

Related terms

  • SetbackThe required distance between the plot boundary and the building line.
  • LevelThe vertical height of a point relative to a datum (zero level).
  • Construction drawingsDetailed drawings used to build the work on site after design approval, including dimensions, levels and details.
  • BackfillRefilling excavations around foundations with suitable soil in compacted layers.

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote