Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Universal access

إمكانية الوصول الشامل

Designing buildings everyone can use, including people with disabilities.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Universal access designs entrances, routes, washrooms, lifts and parking so people with disabilities and older people can use them easily and safely, such as ramps no steeper than about 1:12, wide doors and accessible parking near the entrance.

Why it matters on a project

It is required in public and commercial buildings by the code, and adding it late is costly because it changes entrances, levels and washrooms.

Worked example

A 60 cm level difference at 1:12: ramp length 0.60 × 12 = 7.2 m excluding landings.

Common mistake

Leaving a step between the pavement and the building entrance without a ramp, or a ramp too steep for a wheelchair.

Frequently asked questions

Are private villas required to provide universal access?

The strictest rules apply to public and commercial buildings, but designing a villa for older people from the start is wise.

What door width suits a wheelchair?

A clear opening usually not less than 80 to 90 cm with the leaf open; the binding figure comes from the applicable access code.

Related terms

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote