Category: Safety & quality
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Civil Defence approval covers fire and life safety drawings and systems, such as escape routes, alarm, fire fighting and smoke control, to the fire code SBC 801 and the directorate's requirements. It is needed for commercial, public and large residential buildings.
Why it matters on a project
Without it the operating licence is not issued, and late fire system changes are costly because they touch ceilings, pipes and doors.
Common mistake
Designing fire systems at the end after the architecture is approved, forcing changes to stairs or exits.
Frequently asked questions
Do villas need Civil Defence approval?
Private villas usually not; commercial and public buildings and compounds do.
When should approval start?
At design stage, so exits and fire systems are in the drawings from the start.
Related terms
- Saudi Building Code (SBC)The mandatory design and construction requirements in Saudi Arabia.
- MEP drawingsElectrical, plumbing, HVAC and fire drawings.
- Completion certificateThe certificate showing the building was built to the permit and is fit for use.
- Inspection request (IR)A formal request from the contractor to the consultant to inspect work before the next stage.
Read next
Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote