Category: Safety & quality
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A fire extinguisher is a portable unit holding an extinguishing agent. Common types are multi-purpose dry powder, carbon dioxide for electrical fires, foam for flammable liquids, and water for ordinary solid materials.
Why it matters on a project
Having the right extinguisher near welding, cutting and electrical panels stops a fire before it spreads, and regular inspection is part of the safety plan.
Measurement and pricing
By number, by type and capacity.
Common mistake
Using a water extinguisher on an electrical fire, or placing an expired extinguisher at a welding area.
Frequently asked questions
Which extinguisher for electrical fires?
Carbon dioxide or dry powder, never water.
How often is it checked?
Regular visual checks on site, and certified servicing per the supplier's schedule.
Related terms
- Hot workWelding, cutting, grinding and any work that makes sparks or flame.
- Emergency response planWritten procedures for fire, injury and major incidents on site.
- Safety signsSigns with standard colours and symbols for prohibition, warning, mandatory and guidance.
- Civil Defence approvalCivil Defence approval of fire and life safety systems.
Read next
Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote