Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Heat stress

الإجهاد الحراري

The risk of body overheating when working in extreme heat.

Category: Safety & quality

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Heat stress is a condition where body temperature rises from working in heat and humidity, starting with exhaustion and cramps and possibly reaching heat stroke. In Saudi Arabia the Ministry of Human Resources bans work in direct sun at midday during the summer months.

Why it matters on a project

It affects safety and productivity together. A heat plan covers drinking water, shade, rest, adjusted working hours and watching new workers.

Common mistake

Scheduling concrete pours or roof work at midday in summer, and ignoring signs of exhaustion among workers.

Frequently asked questions

What are the signs of heat stress?

Heavy sweating, dizziness, headache and cramps; stopped sweating with confusion is a danger sign of heat stroke.

How should summer work be organised?

Early starts, water and shade, and keeping to the midday work ban.

Related terms

  • HSE planThe document setting out how health, safety and environment are managed.
  • First aidImmediate care for an injured person on site until medical help arrives.
  • Toolbox talkA short pre-work briefing on the day's task hazards.
  • Labour productivityThe amount of work a worker or crew completes per day.

Read next

Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote